[SLS] Timelapse of Mobile Launcher Platform Move to Pad 39B

2012-06-30 49

The MLP (Mobile Launcher Platform) for the Space Launch System was moved to Pad 39-B on the 16th November 2011 ahead of tests. The MLP will be monitored at the pad as well as water systems tested.